Jobs Engineering Regulatory Officer in Manitoba
Green job Help - Green job - Help

Available jobs

We found 2 engineering regulatory officer jobs in Manitoba on Job Bank. The job postings found are for all Engineering inspectors and regulatory officers (NOC 22231).

News

Read the latest news stories about job creation and layoffs related to the occupation ofmachine set-up operator - electrical appliance manufacturing (NOC 94205).

Calgary-based Eguana Technologies inc., a developer and manufacturer of energy storage solutions, has partnered with BC Hydro in a pilot program that will install energy storage systems in 200 customer homes. The systems will form part of a Virtual Power Plant (VPP) that will help strengthen the local power grid and alleviate fluctuatio9ns in peak electricity load demand.

  • Job creation
  • Utilities
  • Added on 2024-11-27
  • Calgary Region, AB

FuelCell Energy, Inc., a fuel cell manufacturer based in Connecticut, USA, is laying off 17% of its staff and reducing spending on product development. The company operates in the US, Germany and Canada with a manufacturing facility in Calgary, but no layoff numbers were released.

Neoen Renewables Canada has applied to build a large solar farm and battery storage system. Located near the town of Fort Macleod, the facility would be capable of producing 198 megawatts while the new battery system would provide 150 megawatt hours of power.

  • Job creation
  • Utilities
  • Added on 2024-10-17
  • Lethbridge–Medicine Hat Region, AB

Edmonton-based PCL has secured an engineering, procurement and construction contract for three energy storage battery systems in Nova Scotia. Overall construction is scheduled for completion by the end of 2026, with the first site expected to be operational in 2025.

The Alberta Utilities Commission (AUC) has approved the 1,600-acre Saamis Solar Park proposed by the Cork, Ireland-based company DP Energy for a site in Medicine Hat. DP does not have a construction schedule for the $400M project, but AUC has an “in-service” date of late February 2027.

  • Job creation
  • Utilities
  • Added on 2024-07-24
  • Lethbridge–Medicine Hat Region, AB

Enerfin Renewables is planning to add a solar array to its Winnifred Wind Farm near Medicine Hat. Enerfin anticipates that construction could begin in spring 2025 pending regulatory approval from the Alberta Utilities Commission.

  • Job creation
  • Utilities
  • Added on 2024-07-19
  • Lethbridge–Medicine Hat Region, AB
Labour Market Information Survey
Date modified: